$3,122,500 from National Aeronautics and Space Administration to THE LELAND STANFORD JUNIOR UNIVERSITY

SOLAR DYNAMICS OBSERVATORY PROJECT HELIOSEISMIC AND MAGNETIC IMAGER INVESTIGATION (HMI) PHASE B/C/D/E THE CONTRACTOR SHALL PROVIDE PERSONNEL, MATERIALS, EQUIPMENT, FACILITIES AND RESOURCES NECESSARY FOR DESIGN, ANALYSIS, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TESTING, CALIBRATION, QUALIFICATION AND DELIVERY OF A FLIGHT INSTRUMENT FOR SPACECRAFT INTEGRATION. DURING SPACECRAFT INTEGRATION ACTIVITIES, THE CONTRACTOR SHALL SUPPORT INSTRUMENT INSTALLATION AND INTEGRATION, INTEGRATED SPACECRAFT TESTING AND FLIGHT QUALIFICATION, LAUNCH PROCESSING AND LAUNCH. FOLLOWING LAUNCH, THE CONTRACTOR SHALL PROVIDE THE NECESSARY ENGINEERING AND SCIENCE RESOURCES TO PERFORM INITIAL ON-ORBIT CHECKOUT AND CHARACTERIZATION OF THE INSTRUMENT AND SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE PRINCIPAL HARDWARE DELIVERABLES OF THIS EFFORT ARE THE FLIGHT HARDWARE AND SOFTWARE CONSTITUTING THE FLIGHT INSTRUMENT PACKAGE AND THE NECESSARY SCIENCE PROCESSING AND SCIENCE OPERATIONS GROUND SYSTEMS AND SOFTWARE REQUIRED TO ANALYZE, PROCESS, DISTRIBUTE AND ARCHIVE THE SCIENCE MEASUREMENTS PERFORMED BY THE INSTRUMENT.

Signals
Full and openSeven-figure awardMulti-year performance
Office of Federal Procurement Policy
Public Spend Intelligence - sledai.com
Award #CONT_AWD_GSFC0200210DNAS502139_8000_-NONE-_-NONE-
Signed2024-09-24

SOLAR DYNAMICS OBSERVATORY PROJECT HELIOSEISMIC AND MAGNETIC IMAGER INVESTIGATION (HMI) PHASE B/C/D/E THE CONTRACTOR SHALL PROVIDE PERSONNEL, MATERIALS, EQUIPMENT, FACILITIES AND RESOURCES NECESSARY FOR DESIGN, ANALYSIS, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TESTING, CALIBRATION, QUALIFICATION AND DELIVERY OF A FLIGHT INSTRUMENT FOR SPACECRAFT INTEGRATION. DURING SPACECRAFT INTEGRATION ACTIVITIES, THE CONTRACTOR SHALL SUPPORT INSTRUMENT INSTALLATION AND INTEGRATION, INTEGRATED SPACECRAFT TESTING AND FLIGHT QUALIFICATION, LAUNCH PROCESSING AND LAUNCH. FOLLOWING LAUNCH, THE CONTRACTOR SHALL PROVIDE THE NECESSARY ENGINEERING AND SCIENCE RESOURCES TO PERFORM INITIAL ON-ORBIT CHECKOUT AND CHARACTERIZATION OF THE INSTRUMENT AND SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE PRINCIPAL HARDWARE DELIVERABLES OF THIS EFFORT ARE THE FLIGHT HARDWARE AND SOFTWARE CONSTITUTING THE FLIGHT INSTRUMENT PACKAGE AND THE NECESSARY SCIENCE PROCESSING AND SCIENCE OPERATIONS GROUND SYSTEMS AND SOFTWARE REQUIRED TO ANALYZE, PROCESS, DISTRIBUTE AND ARCHIVE THE SCIENCE MEASUREMENTS PERFORMED BY THE INSTRUMENT.

Total obligated$3,122,500.00
PoP Start
2002-10-15
PoP End
2027-09-30
COMPETED
Awarded on 2024-09-24
Vendor
THE LELAND STANFORD JUNIOR UNIVERSITY
Agency
National Aeronautics and Space Administration
Category
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES
Place
CA