Meet With CEO
VENDORFY24

CALIFORNIA INSTITUTE OF TECHNOLOGY

Total obligated$55.3M

CALIFORNIA INSTITUTE OF TECHNOLOGY is an academic institution that has received over $15.1 million in federal contracts. All seven of its contracts were awarded by the National Aeronautics and Space Administration, highlighting its specialized role in space exploration and research. Notably, one of its contracts for the NUSTAR mission spanned over 20 years, making it an exceptionally long-term engagement. The primary work for these projects takes place in California.

Contracts
40
Agencies
2
NAICS used
2
HQ state
CA

Standout signals

Receipts

2023-12-28$173K
EO14042. NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM.
CALIFORNIA INSTITUTE OF TECHNOLOGYDepartment of Defense
signal 1.5
2024-09-11$18.6M
THE ULTRAVIOLET EXPLORER (UVEX)
CALIFORNIA INSTITUTE OF TECHNOLOGYNational Aeronautics and Space Administration
2024-07-15$3.3M
NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
CALIFORNIA INSTITUTE OF TECHNOLOGYNational Aeronautics and Space Administration
2024-09-12$8.2M
THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER
CALIFORNIA INSTITUTE OF TECHNOLOGYNational Aeronautics and Space Administration
2024-09-12$7.8M
THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.
CALIFORNIA INSTITUTE OF TECHNOLOGYNational Aeronautics and Space Administration
2024-08-30$6.7M
SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)
CALIFORNIA INSTITUTE OF TECHNOLOGYNational Aeronautics and Space Administration
2024-09-11$5.8M
SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.
CALIFORNIA INSTITUTE OF TECHNOLOGYNational Aeronautics and Space Administration
2024-09-17$3.2M
DARPA LINC PROGRAM
CALIFORNIA INSTITUTE OF TECHNOLOGYDepartment of Defense
2024-09-06$1.5M
THE EARTH SYSTEM EXPLORERS PROGRAM (ESEP) THE CARBON INVESTIGATION (CARBON-I) MISSION PHASE A CONCEPT STUDY.
CALIFORNIA INSTITUTE OF TECHNOLOGYNational Aeronautics and Space Administration
© 2025 Sled AI Inc. All rights reserved.